HPCL has planned to evacuate the white oil production (MS & HSD) by connecting the Barmer refinery to its existing MDPL Intermediate Pump station at Palanpur, Gujarat for further distribution of products through the existing MDPL/ PVPL. HPCL is currently operating 1054 km long Mundra Delhi Pipeline (MDPL) from Mundra, Gujarat to Bahadurgarh, Haryana. The MDPL originates from Mundra Terminal (Dispatch Station). It has pump stations at Mundra, Santhalpur, Palanpur, Awa, Ajmer and Jaipur. Palanpur Vadodara Pipeline (PVPL) 18” dia and 234 km long originates from MDPL’s existing pump station at Palanpur and terminates at new receiving station cum Marketing Terminal Dumad (Vadodara). Ace Pipeline Contracts Pvt Ltd (ACE) has been awarded for installation of 18” Dia., 109.138 km. approx. from Dispatch Terminal at Ch. 0.00 Km to IP station (Ch. 109.138 Km) for Section 1 of Laying & Construction of Steel Pipeline along with Associated Facilities for Barmer Palanpur Pipeline Project including one (01) Dispatch Terminal (Upto battery limit), one (01) IP station (Up to battery limit) & two (02) SV stations (SV-01 & SV-02).

Project Description
Project Name : SCHEDULE 1 OF LAYING & CONSTRUCTION OF STEEL PIPELINE ALONG WITH ASSOCIATED FACILITIES FOR BARMER PALANPUR PIPELINE PROJECT
Project Length : Total Length- 109.138 Km (Approx.).
Material Specification : API 5L Gr X-70 PSL-2
Diameter : 18” (457mm)
Wall Thickness (mm) : 7.14, 8.74 & 10.31 mm.
Coating : 3LPE & PP
Client : Hindustan Petroleum Corporation Limited
Consultant : Mecon Limited
Contractor : Ace Pipeline Contracts Pvt Ltd.
PIMS : Unistal Systems Pvt. Ltd.
Start Date : 14th December 2020
End Date : 14th February 2022
Website Configuration Date : 09-03-2021
Spread & Section Details
Spread Section Pipeline Section OD(inch) Section Length (Km)
Chanage From (Km) Chanage To (Km)
Schedule-1 Section-1A 0 55.000 18" 55.000
Schedule-1 Section-1B 55.000 109.138 18” 54.138